The Castelo de Bode Hydro Power Plant, located in Abrantes, started operating in 1951.
Technical Information
Start of Operations: 1951
Installed Power: 159 MW
Water Course: Zêzere
Average Annual Production: 361 GWh
Location (GPS Coordinates): 39°32'34''N, 8°19'7''W
Group Type: Simple
Total Storage: 902,5 hm³