The Lares Thermoelectric Power Station, located in Figueira da Foz, started operating in September 2009.

 

Technical information

Location (GPS Coordinates): 40 ° 7'29''N, 8 ° 46'26''W

Net Power (local): 2 x 431 MWe

Yield (100% load): 57.8 %

Annual Fuel Consumption: 720 million Nm³ / year

Annual electricity production: 4 000 GWh

Annual Plant Availability: Greater than 96%

Main Fuel: Natural Gas

Consignment of the Work: June 2007

First Firing: April 2009

First Sync: May 2009

Business Service:

- Group 1: August 2009

- Group 2: September 2009

Installed Power: 442.3 MW

Emission Power: 431.3 MW

Central Lares