The Hídrica de Frades I / Venda Nova II Hydro Power Plant, located in Vieira do Minho, started operating in 2005.
Technical Information
Start of Operations: 2005
Installed Power: 191,4 MW
Water Course: Rabagão
Average Annual Production: 220 GWh
Location (GPS Coordinates): 41°41'34''N, 8°1'40''W
Group Type: Reversible
Total Storage: N/A