Frades I / Venda Nova II Hydro Power Plant

 

The Hídrica de Frades I / Venda Nova II Hydro Power Plant, located in Vieira do Minho, started operating in 2005.

 

Technical Information

Start of Operations: 2005

Installed Power: 191,4 MW

Water Course: Rabagão

Average Annual Production: 220 GWh

Location (GPS Coordinates)41°41'34''N, 8°1'40''W

Group Type: Reversible

Total Storage: N/A

frades_i_-_venda-nova.png